As-Built Surveys
We document what was actually built. GPS-accurate, formatted to your GC's requirements, delivered on your schedule.
Learn MoreAs-built compliance records and construction quality documentation formatted to your GC's submittal requirements. First-submission acceptance is the goal on every project. Lone Star Layouts produces the documentation that gets projects closed without a second submission.
Backed by Stone River Excavation, 11 years Texas earthwork experience
10+ years hands-on BIM, modeling, and layout experience
Trimble, Topcon, Leica and Civil 3D certified
QA/QC documentation failures don't always come from bad work. They come from documentation that doesn't match what the GC's spec sheet asks for, as-built records that aren't formatted correctly, or survey data that wasn't collected with enough density to satisfy the inspector.
A rejected closeout submittal means a return visit, a revised report, a delayed payment and a GC who starts wondering whether you're the right contractor for the next job.
Most earthwork contractors are excellent at building. The documentation side is where jobs get held up. Lone Star handles that side so you can focus on the work.

We produce GPS-accurate as-built records, construction quality control packages and compliance documentation formatted to the specific requirements of your project's closeout spec. We don't produce generic reports and ask your GC to interpret them. We build to their format from the start.
Field data collection is handled by our survey crews across Houston, DFW, Rio Grande Valley and Corpus Christi. Remote processing and report formatting are available for projects outside Texas.

We collect as-built point data across your finished surfaces using GPS rovers. Point density is matched to your GC's spec requirements. Data is collected to the same datum and coordinate system as your design files so comparison is accurate.
We overlay your collected as-built data against your original design surfaces and produce a deviation report. Color-coded deviation mapping shows where finished grades match design and where they fall outside tolerance. You see the comparison before your GC does.
For projects requiring formal CQC documentation, we produce the records required by your spec: compaction testing documentation, grade verification records, lift-by-lift completion logs if applicable. Formatted to the project spec, not a generic template.
Your final deliverable is a complete report package formatted to your GC's submittal requirements. Organized to match their review checklist. Ready to submit on first pass.
If our as-built data shows a deviation outside tolerance before the report goes to the GC, we flag it to you first. You have the option to correct the work before submission rather than receiving a rejection after.
All reports are delivered in PDF format ready for digital submittal and print. If your GC requires a specific file naming convention or delivery method, tell us and we'll match it.
Finished pad elevation verification, subgrade compliance documentation and as-built grade comparison reports formatted to civil engineer or GC requirements. Common for retail, industrial and warehouse developments.
Alignment, grade and cross-section as-built documentation for road grading, drainage and utility corridor projects. Formatted to TxDOT or private GC specs depending on project type.
Foundation grade verification and anchor bolt as-built documentation for PEMB projects. Confirms that the finished slab and bolt pattern match the structural engineer's design before steel erection begins.
Mass grading as-built documentation for residential or mixed-use developments. Pad certifications, drainage swale verification and lot-by-lot grade compliance records where required by the engineer of record.
Send us your GC's closeout requirements, the original design files and any project-specific QA/QC spec sheets. If your GC has a standard submittal checklist, include that too. The more we know about the submittal format upfront, the cleaner the first submission.
We review your spec and design files, confirm the data collection scope and quote the project. If field survey collection is required, we confirm crew availability and schedule the site visit. Most quotes are returned within one business day.
Our survey crew collects GPS as-built data on site. Remote processing produces the deviation comparison and report package. We flag any out-of-tolerance areas before the report is finalized so you have time to address them before submission.
We deliver the complete QA/QC package formatted and ready for submittal. Digital PDF delivery by default. If your GC requires a specific delivery format, we match it. If anything comes back from the GC's review, we address it promptly.
Our remote services go where the project is. Our field crews cover the major earthwork corridors across Texas.

We document what was actually built. GPS-accurate, formatted to your GC's requirements, delivered on your schedule.
Learn More
We produce the machine control files your dozers, graders and scrapers run directly. Trimble, Topcon and Leica format. No translation layer, no guesswork.
Learn More
We take your CAD files and survey data and build the 3D model your GPS equipment needs to run. Earthwork contractors see productivity increases of 33-40% on GPS-guided sites versus conventional layout.
Learn MoreIt varies by project spec, but most earthwork QA/QC packages include GPS as-built survey data, a deviation comparison between as-built and design surfaces, grade verification records and a formatted summary report. Some projects also require compaction testing documentation and lift-by-lift completion logs. We build to whatever your spec requires.
Yes. Our field survey crews cover Houston, DFW, Rio Grande Valley and Corpus Christi, and for projects outside Texas we offer remote report processing and formatting. If field survey data can be provided, we produce the deviation comparison and submittal-ready package from anywhere a file can travel.
If our as-built data shows a deviation outside tolerance before the report goes to the GC, we flag it to you first. You have the option to correct the work before submission rather than receiving a rejection after the fact.
All reports are delivered in PDF format ready for digital submittal and print, formatted to your GC's submittal requirements and organized to match their review checklist. If your GC requires a specific file naming convention or delivery method, tell us and we'll match it.
Timelines depend on scope and whether field collection is required. Most quotes are returned within one business day; once scope is confirmed we schedule the site visit, collect GPS as-built data, and produce the deviation comparison and report package, flagging any out-of-tolerance areas before finalizing.
We are a civil-tech, layout and QA/QC provider, not a licensed surveying firm, so we do not issue sealed or stamped survey documents. What you get is as-built data collection, a deviation report against your design surfaces and QA/QC documentation formatted to your GC's submittal requirements. When a sealed or stamped document is required, we coordinate with your surveyor of record.
Tell us your project type, your GC's submittal requirements and your review deadline. We'll confirm the scope, quote the QA/QC package and get your documentation delivered in time for sign-off.